Due to construction work in the area of Hotel Schloss Mautern, the Danube cycle path will be closed within the town from May 2025 to April 2027. A signposted diversion is in place.
Due to construction work in the Zirkuswiese area (Werftstraße), the Danube cycle path will be completely closed until autumn 2027. A diversion is in place.
Due to construction work, the Danube cycle path between Nordbrücke and Floridsdorfer Brücke will be closed from 23 March 2026 for approximately six months – expected to last until the end of September. The route will be safely and continuously diverted via the lower Treppelweg.